A short AI-narrated film with English captions. Pressing play loads the YouTube player. Watch on YouTube
Guide Origin: Community | ArcKit Version: [VERSION]
/arckit:at-bvergg generates Austrian public procurement documentation aligned with the Bundesvergabegesetz 2018, as amended by the Vergaberechtsgesetz 2026 (BGBl. I Nr. 8/2026, in force 1 March 2026; eForms from 1 October 2026). Covers Oberschwellen / Unterschwellen determination, ANKÖ publication requirements, BVergGVS secondary rules, and the BVwG review pathway.
Inputs
| Artefact | Requirement | Purpose |
|---|---|---|
Requirements (ARC-<id>-REQ-v1.0.md) |
Mandatory (warns if missing) | Scope to be procured — the Leistungsbeschreibung is traced to FR / NFR / INT |
Risk register (ARC-<id>-RISK-v*.md) |
Recommended | Vendor, lock-in, sovereignty and supply-chain risks |
AT DSGVO assessment (ARC-<id>-ATDSG-v*.md) |
Recommended | Auftragsverarbeitung clauses where processors of personal data are involved |
AT NISG assessment (ARC-<id>-ATNISG-v*.md) |
Recommended | Supply-chain clauses where the contracting entity is Essential or Important |
Secure by Design assessment (ARC-<id>-SECD-v*.md) |
Recommended | Security controls to require of the supplier |
| Architecture principles, data model | Optional | Open-source and cloud policy; data categories that drive DPA and sovereignty clauses |
The business case (/arckit:sobc) usually comes first in the workflow below, but the command does not read it — give the Auftragswert in the arguments or the requirements.
Command
/arckit:at-bvergg <project ID or procurement description>
Output: projects/<id>/ARC-<id>-BVERGG-v1.0.md
Strategy Structure
| Section | Contents |
|---|---|
| Executive Summary | Auftragswert, threshold tier, procedure and publication at a glance |
| 1. Contracting Authority and Procedure | Auftraggeber classification, procedure selection (open / restricted / negotiated / competitive dialogue / innovation partnership), threshold determination against current EU thresholds |
| 2. Leistungsbeschreibung | Functional, non-functional, integration and data scope traced to requirements; accessibility (EN 301 549) |
| 3. Eignung | Ausschlussgründe (§78), financial and technical suitability, proportionality |
| 4. Zuschlagskriterien | Bestbieter award criteria, weights and scoring method |
| 5. Vertragliche Regelungen | SLA, Auftragsverarbeitung (DSGVO), NISG supply-chain clauses, IP / open source / exit, governing law |
| 6. Publication and Timeline | ANKÖ and TED notices, eForms, Angebotsfrist, Q&A, standstill, award |
| 7. Review and Remedies | BVwG / Landesverwaltungsgerichte, fees, interim measures |
| 8. Vergabeakt | Procurement file structure, retention, audit trail, ESPD annex |
| External References | BVergG 2018 (idF Vergaberechtsgesetz 2026) + EU directive transposition citations |
Threshold Reference
| Tier | Trigger |
|---|---|
| Oberschwellen | Above EU threshold — full BVergG regime, ANKÖ publication, EU OJ |
| Unterschwellen | Below EU threshold — lighter regime, national publication |
EU thresholds are updated every two years — confirm the current value against the latest EU threshold regulation.
One-Page Workflow
| Phase | Key Activities | ArcKit Commands |
|---|---|---|
| Strategic case | Business case and budget | /arckit:sobc |
| Compliance pre-checks | Personal data + critical-entity status | /arckit:at-dsgvo, /arckit:at-nisg |
| Procurement | BVergG strategy + tender pack | /arckit:at-bvergg |
| Evaluation | Score vendor responses | /arckit:evaluate |
| Traceability | Link procurement requirements back | /arckit:traceability |
Review Checklist
- Threshold determination cites the current EU threshold regulation.
- Procurement procedure choice has documented rationale (matches BVergG criteria).
- ANKÖ publication timing, content, and language meet BVergG §§ requirements.
- Award criteria pre-published with weights summing to 100%.
- DSGVO processor clauses included where personal data is processed.
- NISG supply-chain clauses included where contracting entity is Essential / Important.
- Accessibility clause cites EN 301 549 v3.2.1 (WCAG 2.1 AA), not 2.2 AA — see Key Notes.
- Standstill period and BVwG review pathway documented in vendor pack.
Key Notes
- Vergaberechtsgesetz 2026: the BVergG 2018 was substantially amended (BGBl. I Nr. 8/2026, in force 1 March 2026; eForms from 1 October 2026) — permanent Direktvergabe limits (supplies/services €143K, works €200K; document ≥3 offers from €50K), harmonised Ausschlussgründe/Selbstreinigung, eForms below-threshold, and a tiered Nachprüfungs-fee system. The BVergG 2018 keeps its name and numbering.
- Threshold drift: EU procurement thresholds change every two years — items marked
[NEEDS VERIFICATION]must be confirmed against the latest regulation before external publication. - Accessibility standard version: §107 BVergG invokes EN 301 549, and the version that matters is the one cited in the Official Journal, because that is what carries a presumption of conformity. Today that is v3.2.1, which normatively references WCAG 2.1 AA. The revision carrying WCAG 2.2 AA (v4.1.1, drafted as v4.1.0 for public review in November 2025) is expected to be OJ-cited around October 2026
[NEEDS VERIFICATION]. Specifying 2.2 AA before that citation raises the bar above what the law requires without saying so, which is a defensible choice for a long contract but has to be a stated decision rather than a copied figure. Note this differs from the UK, where SI 2022/1097 replaced the fixed WCAG reference with a rolling one and 2.2 AA is already the monitored target — that UK position does not transfer to an EU-derived regime. - Defence, concessions and utilities follow other rules: defence and security procurement falls under the BVergGVS 2012, concessions under the BVergGKonz 2018, and utilities (Sektorenauftraggeber) under the sector provisions of the BVergG 2018 itself — confirm which applies before relying on the standard BVergG path.
- Run after pre-checks:
/arckit:at-dsgvoand/arckit:at-nisgshould run first if either applies — their clauses feed the vendor pack. - Community-contributed: Output should be reviewed by qualified Vergabejurist / Rechtsabteilung before reliance.