Back to Guides

A short AI-narrated film with English captions. Pressing play loads the YouTube player. Watch on YouTube

Guide Origin: Community | ArcKit Version: [VERSION]

/arckit:au-ism-controls generates a Statement of Applicability against the Australian Signals Directorate's Information Security Manual (ISM). It scopes the system, surveys the 17 ISM control domains for in-scope controls, scores each control's implementation posture with evidence, captures the residual risk, and surfaces the IRAP-assessable posture (Information Security Registered Assessors Program — the Australian government's cloud-inheritance and external-assessment programme).

The ISM is the authoritative control library for Australian Federal entities and DISP suppliers. The SoA is the gate artefact for IRAP assessment, security accreditation, and the PSPF Technology domain (which requires the ISM to be applied).


Inputs

Artefact Purpose
Requirements (ARC-<id>-REQ-v1.0.md) Service description, hosting model, data flows
Data model (ARC-<id>-DATA-v*.md) Sensitivity categories driving control intensity
/arckit:au-e8-posture output (ARC-<id>-AUE8-v1.0.md) Cyber baseline that the ISM SoA cross-references
Vendor HLD (vendors/*/hld-v*.md) Architecture, identity model, key management

Command

/arckit:au-ism-controls <project ID or service description>

Output: projects/<id>/ARC-<id>-AUISM-v1.0.md


Assessment Structure

Section Contents
Document Control Australian classification (UNOFFICIAL / OFFICIAL / OFFICIAL:Sensitive / PROTECTED / SECRET / TOP SECRET)
Revision History Version, date, author, changes, approvals
Executive Summary System, classification, ISM edition used, overall applicability posture, key gaps, IRAP and DISP position
System Context System name, classification, deployment model, IRAP status and scope, DISP membership, ISM edition used, sovereignty, assessment date, assessor
Control Domain Applicability Matrix All 17 control areas: applies, implementation status, notes
Per-Domain Control Applicability Assessment For each area: applies, implementation, applicable ISM control IDs, evidence, gaps, remediation, compensating controls
ISM-to-E8 Cross-Reference Which control areas each Essential Eight strategy maps to
Compliance Summary Per-area applicable, implemented and gap counts; overall applicability score (implemented / applicable)
IRAP Assessment Position IRAP status and scope, accepted residual risks, re-assessment cadence, cloud provider inheritance
Recommendations Quick Wins / Short-Term / Medium-Term, each with ISM control IDs and area
ArcKit Evidence Integration Diagram, DFD, data model, ServiceNow, risk, traceability, graph-report and maturity-model evidence
External References Document register (ISM edition), citations, unreferenced documents, verification dates
Visual Evidence Decision Rule When a companion diagram is drawn, drafted with Pending Input labels, or recorded as a visual evidence gap

Regulatory Anchors

  • ASD Information Security Manual (ISM) — 17 control domains; quarterly-updated control library
  • PSPF Technology domain — the federal protective security policy requires the ISM's cyber security principles and controls to be applied across the technology lifecycle
  • IRAP (Information Security Registered Assessors Program) — primary external-assessment route, especially for cloud inheritance
  • Cyber Security Act 2024 (Cth) — incident reporting obligations relevant to security incidents tracked against ISM controls
  • PGPA Act 2013 s16 — federal accountable-authority duties

When to Run

  • During HLD / detailed design, after the architecture has stabilised enough to enumerate control inheritance
  • Before IRAP assessment kicks off (the SoA is the input to the assessor's scoping)
  • Re-run on material architecture change or quarterly ISM update where control changes affect the system
  • DISP Level 2+ suppliers refresh on the attestation cycle

Common Pitfalls

  • Treating every ISM control as in-scope — the SoA is about applicability. Mark out-of-scope controls explicitly with rationale; assessors flag thin-scoping faster than thick-scoping.
  • Claiming inheritance without an IRAP letter — cloud or platform inheritance requires a current IRAP assessment letter. Without it, the control is not inherited — it's the customer's to implement.
  • Stale evidence dates — ISM controls reference fresh evidence (logs, configs, scan output). Mark anything older than the assessment window as stale.

Handoff

Foundational input to /arckit:au-disp-attestation (DISP Information & Cyber domain draws heavily from the ISM SoA), /arckit:au-pspf (the PSPF Technology domain cites ISM SoA evidence), and feeds the IRAP assessor scoping package.