A short AI-narrated film with English captions. Pressing play loads the YouTube player. Watch on YouTube
Guide Origin: Community
/arckit-nl:nl-gemma maps a gemeente's application landscape onto GEMMA (Gemeentelijke Model Architectuur, VNG Realisatie): the referentiecomponenten its applications fill, the bedrijfsfuncties they support, the standards and data exchange GEMMA expects between them, and where the landscape falls short. The result is a set of roadmap candidates, each traced to a finding. It describes what applications are used for. It never calls a product "GEMMA-compliant" and never recommends products or suppliers; product information belongs in the GEMMA Softwarecatalogus.
See also: Netherlands overlay guide · NORA conformance guide
Inputs
| Artefact | Purpose |
|---|---|
GEMMA referentiecomponenten extract (projects/000-global/external/gemma-referentiecomponenten.md) |
Mandatory. Components, applicatieservices, groups, standards and data exchange, built by the overlay's nl-references.py from the GEMMA Archi-repository. Without it the command stops and writes nothing. |
GEMMA bedrijfsfunctiemodel extract (gemma-bedrijfsfuncties.md) |
Optional. Needed for bedrijfsfunctie coverage (Section 4); without it that section is skipped and the gap noted. |
GEMMA principles extract (gemma-principes.md) |
Optional. Lets roadmap candidates name the GAP principle they serve. |
| A landscape source | Mandatory. In order of strength: an explicit mapping (a GEMMA Softwarecatalogus export, the gemeente's ArchiMate model, an inventory with a GEMMA column), an application inventory (ARC-<id>-APP, from /arckit-togaf-adm:application-inventory in the TOGAF ADM overlay), other application lists, plates or contract registers in external/, or applications named in the input. Without any, the command stops and says which would help. |
Architecture principles (ARC-000-PRIN-v1.0.md) |
Recommended. Portfolio, standardisation, reuse and cloud principles |
Requirements (ARC-<id>-REQ-v1.0.md) |
Recommended. Required capabilities and integrations, when the scope is one project |
| Data model, diagrams | Recommended. Integrations and data flows, as evidence for data exchange |
| NORA assessment, roadmap, capability map, risk register | Optional. Read when present |
Command
/arckit-nl:nl-gemma <project ID or scope>
In Claude Code the overlay installs as its own plugin, arckit-nl, so the command is /arckit-nl:nl-gemma.
Example: /arckit-nl:nl-gemma Map the full application landscape of the gemeente for 001, using the ArchiMate extract in 000-global/external
Output: projects/<id>/ARC-<id>-GEMMA-v1.0.md. A re-run writes the next version beside the earlier one.
The command first runs nl-references.py gemma to fetch or refresh the extracts. The overlay guide explains the statuses, offline builds from a downloaded GEMMA release.xml, and extracts placed by hand. A manual or offline status is recorded under Source limitations.
How the Landscape Is Mapped
- Each application is mapped to one or more referentiecomponenten, using only names that appear in the extract, with a confidence:
- Stated — a source links the application to the component explicitly; the source is cited.
- Inferred — derived from the application's described purpose and the component's description and applicatieservices; a one-line rationale is given. Most landscapes have no explicit mapping, so most mappings are Inferred, and the summary shows the split.
- Unmapped — no component fits, and none is forced.
- Coverage lists the filled components, with an overlap flag where several applications fill one, and the unfilled components with a relevance judgement: Expected, Possibly not needed, or To be confirmed (the default). Overlap is examined for sector-specific use before it is called a finding.
- Bedrijfsfunctie coverage marks each function in scope Supported, Not supported (a landscape gap), or No GEMMA component (a property of the reference model, not of the landscape).
- Standards and data exchange are evidence-based: a standard is Supported, Not supported or Unknown per application, and a GEMMA data exchange between filled components is Present, Absent or Unknown. Unknown is the default; GEMMA linking a standard to a component says nothing about a product.
- Roadmap candidates follow from the findings: Rationalise, Fill, Standardise, Integrate, or Replace or keep (with an ADR). Each has a priority with a reason and, when the principles extract is present, the GAP principle it serves.
If the organisation is not a gemeente, the mapping says so prominently: GEMMA is the municipal reference model, and the result is then indicative only.
Deliverable Snapshot
| Section | Contents |
|---|---|
| Executive Summary | Scope, GEMMA source version, mapping split (Stated / Inferred / Unmapped), coverage figures, key findings |
| 1. Scope and Sources | The gemeente and scope, every landscape source with its date, every extract with its source version, Source limitations |
| 2. Application Mapping | Each application, its product and supplier as the sources state them, components, confidence and evidence |
| 3. Coverage of Referentiecomponenten | Filled components with overlap flags; unfilled components by group, with relevance judgements |
| 4. Bedrijfsfunctie Coverage | Supported, Not supported and No GEMMA component per group, with the Not supported functions listed |
| 5. Standards | Per filled component, the GEMMA standards and each application's support, with evidence |
| 6. Data Exchange and Buitengemeentelijke Voorzieningen | GEMMA data exchange between filled components, and the voorzieningen the landscape connects to |
| 7. Roadmap Candidates | Each candidate with its type, the finding it traces to, a priority with a reason, and the GAP principle where available |
| 8. External References | Every extract (with the EUPL licence line) and every landscape source in the Document Register |
Review Checklist
nl-references.pyran first, and amanualorofflinestatus is under Source limitations with the script's note and error.- Every component, applicatieservice, bedrijfsfunctie and standard name matches the extract exactly; none is invented, merged or renamed.
- Every application has a confidence: Stated mappings cite their source, Inferred mappings give a rationale, Unmapped applications are not forced.
- Overlap is checked for sector-specific use before a rationalisation candidate is proposed.
- Unfilled components carry a relevance judgement with a reason.
- Bedrijfsfunctie coverage keeps Not supported (landscape gap) apart from No GEMMA component (reference-model property).
- Standards and data exchange rest on evidence, with Unknown where there is none.
- Every roadmap candidate traces to a finding and has a priority with a reason, and no product or supplier is recommended or called GEMMA-compliant.
- Inferred mappings are validated with the application owners before the mapping is relied on, and the GEMMA text is checked against gemmaonline.nl.
Next Steps
/arckit:roadmap— turn the roadmap candidates into a sequenced architecture roadmap./arckit-nl:nl-nora— assess NORA and GEMMA principle conformance; this mapping is evidence for the reuse and standardisation principles./arckit:adr— record decisions on overlapping applications, and on unmapped applications that will be kept./arckit:principles— reflect GEMMA alignment in the organisation's architecture principles if they do not reference it yet.