What is ArcKit?
ArcKit is an AI harness that wraps your AI coding assistant: it gates, traces, and provenance-stamps everything the assistant produces. From stakeholder analysis and risk registers to design reviews and traceability matrices, every artifact is template-driven and audit-ready. A UK Government baseline ships alongside community-contributed jurisdiction and sector overlays (EU, France, Netherlands, Austria, Canada, UAE, Australia, USA, UK Finance, UK NHS, UK Legacy IT, UK Food Safety, UK G-Cloud). It installs as a Claude Code plugin, and for Gemini CLI, Codex CLI, OpenCode CLI, GitHub Copilot, Mistral Vibe, Kimi Code CLI and Paperclip, with an experimental plugin for Google Antigravity.
Systematic
Follow GDS Agile Delivery phases with a structured command workflow. Every artifact is version-controlled, traceable, and linked to business drivers.
Multi-Jurisdiction
UK Government core (TCoP, Secure by Design, GDS Service Standard, MOD JSP 936, HM Treasury Green/Orange Books) with community overlays for GDPR, AI Act, NIS2, ANSSI, PDPL, and more.
AI-Assisted
Works with Claude Code, Gemini CLI, Codex CLI, OpenCode CLI, GitHub Copilot, Mistral Vibe, Kimi Code CLI and Paperclip, and experimentally with Google Antigravity. AI generates first drafts from templates; architects review and refine.
Watch first
New to ArcKit, or explaining it to someone who doesn't use a coding assistant? Start with a film. The links open YouTube; nothing loads from it until you choose one.
ArcKit explained
What ArcKit is and how it keeps AI-drafted architecture documents reviewable, in under eight minutes.
ArcKit for Beginners
One fictional council project, followed from its architecture principles to the release decision. One hour, or four shorter parts.
ArcKit commands
A film of about a minute and a half for each command: what it is for, when to run it and what it produces. Each command on the commands page links its own.
The ArcKit YouTube channel also has a playlist for each overlay. The narration is AI-generated and the films are experimental.
How it fits together
Your AI coding assistant sits at the bottom. Every tool call is intercepted by The Enterprise Governance Harness — gates block unsafe writes, the core engine drives generation, sector overlays and live MCP knowledge compose in, and observers stamp provenance and traceability. What comes out the top are governed, audit-ready artifacts.
How it works
ArcKit follows the UK Government's GDS Agile Delivery framework, with commands mapped to each phase:
Planning
Planning
Define architecture principles and create your project structure.
Discovery
Identify stakeholders, assess risks, and build the strategic outline business case.
Alpha
Gather requirements, model data, research technology options, and map strategy.
Beta
Procure services, evaluate vendors, review designs, and generate the delivery backlog.
Live
Verify traceability, ensure operational readiness, and tell the project story.
Jurisdictions covered
ArcKit ships a UK Government baseline alongside eight community-contributed jurisdictional overlays. Use the command reference to filter by jurisdiction or tier — every overlay command is badged [COMMUNITY] and excluded from the official-tier count. Working in UK government? Start with ArcKit for the UK public sector.
GDS Service Standard, Technology Code of Practice, Secure by Design, MOD JSP 936, HM Treasury Green & Orange Books, G-Cloud and DOS procurement, AI Playbook, ATRS.
Jurisdiction-agnostic foundations: requirements, ADRs, Wardley Mapping, DevOps / MLOps / FinOps, traceability, conformance, vendor evaluation, procurement market intelligence.
GDPR, EU AI Act, NIS2, DORA, Cyber Resilience Act, Digital Services Act, Data Act, Cloud Sovereignty Framework.
ANSSI Guide d'hygiène, SecNumCloud 3.2, EBIOS Risk Manager, DINUM (RGI / RGAA / RGS / RGESN), CNIL RGPD, Diffusion Restreinte, code de la commande publique.
Rijksbreed cloudbeleid 2026, Te Beschermen Belangen (TBB) categories under VIRBI 2025, BIO2 conformance, cloud exit planning, NORA conformance and GEMMA landscape mapping.
NISG (NIS2 transposition), DSG / DSGVO, Bundesvergabegesetz 2018 procurement, BaFG / WZG accessibility.
FITAA (C-70), PIA, ATIP, Algorithmic Impact Assessment, Charter, SOIA, GC Digital Standards, cloud residency, Official Languages Act, OCAP, PSPC procurement.
PDPL, IAS controls, sovereign cloud residency, UAE Pass integration, Smart Data classification, AI Charter, autonomy tier, federal procurement, digital records.
ASD Essential Eight, Information Security Manual, DTA Digital Service Standard, Privacy Act 1988 PIA, OAIC Notifiable Data Breach playbook, Protective Security Policy Framework, DTA AI Assurance, DISP supplier attestation, OT security, SOCI/CIRMP.
FedRAMP authorization, FISMA / NIST 800-53 Rev 5, CISA Zero Trust Maturity, OMB M-19-17 ICAM, NIST AI RMF, OMB M-25-21/M-25-22 AI assurance, E-Gov §208 PIA, EO 14028 SBOM. Install: claude plugin install arckit-us@arckit-claude, then claude plugin enable arckit-us.
PSD2 SCA-RTS exemption design (UK SCA-RTS Articles 10-18, including 10A), EMI / PI safeguarding assessment (EMR 2011, PSRs 2017, FCA PS25/12 and CASS 15), FCA Consumer Duty board report (PS22/9), Critical Third Parties dependency assessment (PS24/16). v1 audience: architects at established UK PSPs / EMIs / PIs scaling regulated operations.
For small caterers in England and Wales: the business profile, the five sections of safe methods, the business's own methods, its allergen information, cleaning schedule and suppliers and contacts, the pack's blank diary and record sheets, and a completion record, built from the Food Standards Agency's Safer food, better business for caterers pack. Only an answer a named person at the business confirms is printed as the business's answer, the allergen information never works an allergen out or looks a product up, and a named person signs off each finished document; the blank forms are filled in and signed by hand. Not legal advice; the Food Standards Agency has not reviewed or endorsed it. Install: claude plugin install arckit-uk-food@arckit-claude, then claude plugin enable arckit-uk-food.
Evidence-led system classification, independent numerical risk and an owned remediation plan. Dated framework sources are bundled for offline assessment.
NHS DCB0129 (manufacturer) and DCB0160 (deployer) Clinical Safety Case + Hazard Log (Marcus Baw SAFETY.md spec), NHS DTAC (form v2.0), UK MDR 2002 + EU MDR 2017/745 software-as-medical-device (SaMD / AIaMD) classification.
AESCSF maturity assessment and energy-sector compliance (AER ring-fencing, AEMC NER/NGR, AEMO interfaces, DERMS/DOE, CSIP-AUS, SOCI escalation), layered on the Australian Federal baseline. Install: claude plugin install arckit-au@arckit-claude and claude plugin install arckit-au-energy@arckit-claude, then claude plugin enable arckit-au and claude plugin enable arckit-au-energy.
Supplier-side UK G-Cloud 15 (Digital Marketplace) bid authoring: supplier profile, social value, lot questions, the Procurement Act 2023 supplier declaration, service design, Service Definition Documents for Lots 1a, 1b, 2a, 2b and 3, pricing and DDaT rate card, security evidence, competitor benchmark, submission review, and final submission pack. Proprietary licence (not MIT), not distributed to the non-Claude extension formats. Recipe uk-gcloud-submission. Install: claude plugin install arckit-uk-gcloud@arckit-claude, then claude plugin enable arckit-uk-gcloud.
Architecture documentation
Community overlays also include arc42, a documentation structure for a system's architecture. It assembles existing artefacts into 12 sections with source citations and a Gap Register, documents the quality scenarios, crosscutting concepts and technical debt it summarises, hands the result over to Spec Kit, and works across jurisdictions. Other overlays cover TOGAF ADM, Open Agile Architecture, AI agent architecture and repository tooling.
What ArcKit does not do
ArcKit generates DRAFT artefacts for qualified people to review. It is not legal, regulatory, clinical, or security advice, and no output it produces is a submission, a certification, an accreditation, or a compliance decision.
A generated DPIA is not a completed DPIA: UK GDPR Article 35 places the assessment on the controller. A generated Secure by Design or JSP 936 pack is not an assurance decision. The EU overlay drafts documentation referencing the AI Act, NIS2, DORA and the CRA; it does not perform conformity assessment. Clinical safety artefacts require a registered Clinical Safety Officer. Citations reflect the moment they were fetched, and generated content can be wrong.
Government Code Discovery
Search 24,500+ UK government repositories before building from scratch. Powered by govreposcrape, no API key required.
gov-code-search
Natural language search across government repositories. Find how other departments solved similar problems.
gov-reuse
Systematic reusability assessment. Score candidates on licence, quality, documentation, tech stack, and maintenance.
gov-landscape
Map the government code landscape for a domain. Identify who built what, common patterns, and collaboration opportunities.
Supports TCoP Point 3 ("Be open and use open source") and the CDDO "reuse before build" principle. /arckit:research also reports whether a GOV.UK platform or open-source project already covers each capability, as evidence; /arckit:wardley and /arckit:sobc make the build-or-buy call.
Open Knowledge Format exchange
Share ArcKit architecture knowledge as portable Markdown bundles with OKF-compatible frontmatter, or import external OKF bundles as reviewable research notes.
export-okf
Copy ArcKit ARC-*.md artifacts into an OKF bundle with portable metadata. Source artifacts stay unchanged.
import-okf
Classify OKF Markdown, write an import report, and materialize safe entries as RSCH review notes.
Opt-in stamping
Native ARC frontmatter stamping is disabled by default and enabled only through explicit project config or environment.
Works with your AI
The commands and templates are the same on every assistant, apart from a few that need Claude Code, such as /arckit:build and the UK G-Cloud overlay. Choose the platform that fits your workflow; Getting Started has the full steps for each.
Claude Code
PremierFull experience with agents, hooks, MCP servers, and output validation.
/plugin marketplace add tractorjuice/arckit-claude
Gemini CLI
FullNative extension with the commands, templates, scripts, and MCP servers.
gemini extensions install tractorjuice/arckit-gemini
OpenAI Codex CLI
CoreSkills and templates as a Codex plugin, or copied into your project by the CLI.
arckit init my-project --ai codex
OpenCode CLI
CoreCommands and templates with flexible model selection.
arckit init my-project --ai opencode
GitHub Copilot
CorePrompt files and agents for VS Code Copilot Chat.
arckit init my-project --ai copilot
Mistral Vibe
FullExtension with skills, agents, templates, and MCP servers. Clone it and link it into your Vibe extensions folder.
git clone https://github.com/tractorjuice/arckit-vibe.git
Kimi Code CLI
FullPlugin with every command as an Agent Skill, plus MCP servers. Install it from the Kimi prompt.
/plugins install https://github.com/tractorjuice/arckit-kimi.git
Paperclip
CorePlugin with every command as a Paperclip tool. Clone it, build it, then install the folder.
paperclipai plugin install .
Google Antigravity
ExperimentalPlugin with every command as an Agent Skill. Eight core commands have been run there; the rest are untried.
agy plugin install https://github.com/tractorjuice/arckit-antigravity
Latest writing
View all articles →Explore
AI Commands
Browse every command across the official baseline plus community jurisdictional overlay categories. Filter by jurisdiction, tier, status, or category.
Guides
A usage guide for every command across every jurisdictional and sector overlay, plus topical guides on discovery, planning, architecture, governance, compliance, and operations.
Role Guides
18 guides mapped to the DDaT Capability Framework for architects, CTOs, product managers, and more.
Example Projects
AI-generated architecture documentation from 25 public test repositories spanning health, AI, cloud, and data.
ArcKit Certification
Show you can use ArcKit. Take the free Awareness quiz and add a signed Open Badges 3.0 credential to your LinkedIn profile. Foundation follows in January 2027.
Ready to get started?
Set up ArcKit in 5 minutes and generate your first architecture artifact.
Getting started guide